Skip to content
← All guides

Starting a campervan conversion business: the planning hours nobody budgets for

· 7 min read

Starting a campervan conversion business means paying for a planning loop on every build — layout drafts, client revisions, a payload check, a cut list, a spec sheet, a quote and the registration paperwork — and with the illustrative numbers below that loop is about 29 hours per sold van, most of it unpaid unless you price it in. The workshop, the tools and the van stock show up in every business plan. The planning hours usually don't, because they arrive one email at a time.

This post is about that loop: what it contains, how to count your own hours, and how a shop turns it from a pile of evenings into a process. It does not cover company formation, tax or insurance — those are local, and I am not the right person to tell you how they work where you are.

The loop every client build goes through

Every custom build, whatever the van, passes through the same steps before the first sheet of plywood is cut. Each one produces something the client or the inspector needs, and each one has a reason to repeat.

StepWhat it producesWhy it repeats
Enquiry and briefPeople, budget, van, must-havesThe brief changes once the client sees a drawing
Layout draftsA floor plan the client can readBed length, shower or no shower, garage height
Client revisionsAn agreed layoutPartners, second opinions, a van they saw on Instagram
Payload and axle checkProof the build stays under the van's mass limitsEvery added tank, battery or seat moves it
QuoteParts, labour, markup, a priceEvery revision changes it
ApprovalA signed-off versionA verbal yes is not a version
Cut list and sheet layoutWhat the workshop actually builds fromRe-measuring from a drawing introduces errors
Spec sheet and paperworkWhat the client, insurer and inspector readRegistration rules differ by country
Change ordersA record of what changed after approvalClients change their minds mid-build

None of these steps is optional for a paid build. A DIY builder can plan a layout on a napkin and fix mistakes as they go. A shop that does the same eats the mistakes at its own labour rate.

Count your own hours

I don't have survey data on how long shops spend here, and I would distrust anyone who quotes one number for every shop. What you can do is count it for yours. The formula is plain:

planning hours per sold build = (drafts × hours) + (revision rounds × hours) + payload check + cut list + spec sheet and quote + paperwork + change orders + unsold enquiries ÷ builds

Here is a worked example. The numbers are illustrative assumptions for a one- or two-person shop drawing in general-purpose CAD, not measurements. Replace each with yours.

ItemAssumptionHours
Layout drafts3 drafts × 2 h6
Revision rounds4 rounds × 1 h4
Payload and axle checkWeighing parts, spreadsheet2
Cut list and sheet layoutFrom the final drawing4
Spec sheet and quoteRetyped from drawing and parts list2
Registration paperworkPhotos, weights, component list3
Change orders during the build2 changes × 1 h2
Unsold enquiries2 per sold build × 3 h first draft6
Total per sold build29

Ten builds a year at 29 hours each is 290 hours: about seven 40-hour weeks of work that, in a lot of first business plans, has no line. If your labour rate is set from build hours alone, those seven weeks are paid out of your margin.

The two rows people forget are the last two. Change orders happen after the price is agreed, so they are pure loss unless they are written down and priced. And the enquiries that never sign still got a drawing — in this example, they cost as much as the drafts for the van you did sell.

Where the hours leak

Most of the time isn't spent thinking. It's spent re-entering the same information in a different place:

  • Redrawing. The client's sketch becomes a CAD drawing, the drawing becomes a 3D render for the client, the render becomes a cut list. Every hand-off is a chance to get a measurement wrong.
  • Payload at the end. Weight gets checked after the layout is agreed, and the client learns that the payload reserve is gone only when the van is half built.
  • Quotes rebuilt by hand. A parts list in one file, prices in another, labour in your head. Each revision means doing the sum again.
  • Approval in a WhatsApp thread. "Looks good!" on a screenshot is not a record of which version was agreed — and that is the version a dispute will be about.
  • Paperwork from scratch. Weights, component lists and photos for the inspector, assembled per van instead of coming out of the plan.

How a shop systematizes it

The shops that keep this under control do the same few things, whatever software they use:

  1. One file from enquiry to cut list. The layout the client approves is the layout the cut list comes from. Nothing gets redrawn.
  2. Packages instead of empty vans. Two or three base layouts per van you convert. Most clients start from one and change a third of it, which turns three drafts into one.
  3. A parts library with weight, price and fitting hours. Your kitchen pod, your bed frame, your seat box — modelled once. Every layout then prices and weighs itself.
  4. Payload checked at every draft, not at the end. The payload calculator is enough for one van; a shop needs it live in the layout.
  5. A written approval that freezes a version, and change orders listed against that version with their price and weight.
  6. The client does the first draft. If clients can lay out their own van on your vans with your parts, the unsold-enquiry row shrinks to a phone call.
  7. A design fee or deposit, credited against the build. That pays for the loop when the client walks.

Registration and paperwork differ by country

Whether a converted van can be registered as a motorhome, who inspects the gas and electrics, and what a business doing conversions has to show are national rules, and they differ more than most people expect. I keep them out of this post on purpose. For the countries I have written up from their own sources: UK and US conversion rules. Everywhere else, the national vehicle authority is the source — and a local accountant for the business side.

Where VanPlot fits

I built VanPlot as a 3D planner for DIY builders — 53 vehicles in 277 variants with real interiors, live payload and axle loads, stud-level cut lists. The Workshop licence adds the parts of the loop above that a shop needs:

  • 3 seats (you plus two colleagues) with shared projects and live co-editing, and a board of client jobs by status.
  • A quote page in a Build Pack with your logo: your prices, your fitting hours per part type, your markup.
  • Client approval: the client presses Approve and that version is frozen; change orders are listed against it with price and weight.
  • A compliance checklist for the country you register in, filled from the layout.
  • A public planner page at vanplot.com/shop/your-name, where customers design for free on your vans with your parts and prices, and each design lands in your workshop as an enquiry.

It costs $329 / €299 once for the first 10 workshops, then $549 / €499, tax included, no renewal. Putting the planner page inside your own website is optional, $54 / €49 a month. The $39 personal licence is for your own van only. If you are setting up a shop, see what the Workshop licence includes or write to me at vladimir@vanplot.com.

FAQ

How many hours does the planning side of a conversion take per build?

There is no published industry figure I can cite. Count it yourself: first drafts, revision rounds, the payload and axle check, the cut list, the spec sheet and quote, the registration paperwork and change orders during the build — plus the drafts for enquiries that never sign. With the illustrative numbers in this post that is about 29 hours per sold build, or roughly seven 40-hour weeks across ten builds a year.

Should a conversion shop charge for design work?

The hours have to be paid by something. The two usual ways are a design deposit that is credited against the build if the client signs, or design hours built into the labour rate. Either works. Unlimited free revisions before a signature is the version that does not.

Do I need special approval to convert vans as a business?

It depends on the country. Registration of a converted van as a motorhome, gas and electrical sign-off, and the rules for a business doing it differ per jurisdiction. This post is not legal advice; check with your national vehicle authority and a local accountant before you take the first deposit.

Can I use the $39 personal VanPlot licence for client builds?

No. The lifetime licence covers one person's own vans (Terms §6). Client work, team seats and the shop features — quote page, client approval, change orders, the public planner page — are the Workshop licence: $329 / €299 once for the first 10 workshops, then $549 / €499.

Your van is waiting. Measure it, then plan it.

In sixty seconds you'll be dragging a bed into a Ducato. Free, in your browser.

Vladimir Šterjoski

Who makes this

I'm Vladimir. I'm planning my own conversion, and none of the tools I tried could tell me whether a layout would fit or what it would do to the rear axle, so I made this one. I work on it alone. If something's wrong or missing, write to me — the address goes to my inbox.

Vladimir Šterjoski

vladimir@vanplot.comWhy I made it