Skip to content
← All guides

The van conversion spec sheet: what the customer signs before you cut the first panel

· 7 min read

Before you cut the first panel, put one document in front of the customer: a spec sheet with dimensioned plan views, an item list with weights, payload remaining and the axle split, a power budget, water capacity, headroom and bed sizes, the price, and a version number they approve with a name and a date. If any of those eight is missing, it is the one you will argue about at handover.

I build VanPlot, a van layout planner, and since November 2026 it has a licence for conversion workshops. Almost every request from the shops I talk to has been about this moment: the customer has seen renders and a rough price, the deposit is due, and the shop wants something on paper that says what was agreed. Not a mood board. A spec sheet.

Why a spec sheet, not a nice drawing

A conversion runs into five figures and takes weeks. The disputes I hear about are rarely about workmanship. They are about expectations nobody wrote down:

  • “I thought the bed was a double.” It was 120 cm wide, which is a double to the shop and a large single to the customer.
  • “I thought I could stand up.” The van is an H2 with 1.89 m on the brochure; after floor and ceiling the customer has about 1.82 m, and he is 1.86 m.
  • “Why is it over weight with my bikes on?” Nobody told him the payload left after the build was 380 kg and the bikes, water and two people take 300 of it.

Each of these is a number. A spec sheet is the list of numbers, signed off before the saw comes out.

The checklist: eight sections

#SectionWhat it showsThe argument it prevents
1Plan viewsTop view and side elevation to scale, with dimensions to walls and floor“The kitchen was supposed to be longer”
2Item list with weightsEvery cabinet, appliance, tank and battery, with its weight“What did I pay for?”
3Payload and axlesPayload remaining after the build, reserve for people and gear, front/rear split“It’s over weight at the first weighbridge”
4Power budgetDaily draw in Wh, battery size, solar, days without sun“The fridge dies on day two”
5WaterFresh and grey tank litres, days for the number of people“The tank lasts one shower”
6Headroom and bedFinished standing height, mattress size in cm, sitting-up room above the bed“I can’t stand up” / “It isn’t a double”
7PriceParts, labour, total, what is excluded, validity, deposit schedule“The price went up”
8Version and approvalVersion name, date, the customer’s name against it“That’s not what I agreed to”

1. Dimensioned plan views

A top view and a side elevation at a fixed scale, with every unit located from a wall and the floor. Measurements in the drawing, not in an email. The customer will not read a 1:20 drawing like a carpenter, but they will check the two numbers they care about: aisle width and bed length.

2. Item list with weights

One line per item: what it is, the model where it matters (fridge, heater, battery), and its weight. Builders skip weights because they are tedious to find. They are also the only way section 3 can be true. If a weight is an estimate, say so on the line.

3. Payload remaining and axle split

Three numbers: the van’s rated payload, what the build adds, and what is left. Then the reserve. The European motorhome standard EN 1646-2 sets a minimum free payload of 10 kg per metre of length, 10 kg per berth and 75 kg per travel seat — 325 kg for a 6 m van with 4 berths and 3 seats. The payload reserve guide works it through. Add the front/rear split, because a heavy rear garage can overload the rear axle while the total is still legal (weight distribution). Write on the sheet that the figures are calculated and the van gets weighed before handover.

4. Power budget

Daily draw in watt-hours, from the appliances actually on the list; battery capacity and chemistry; solar watts; and how many days the system lasts without sun. Name the assumption (summer or winter sun). This is the section that turns “off-grid” from a word into a number. The battery and solar sizing guide has the method.

5. Water capacity

Fresh and grey tank sizes in litres and how many days that is for the number of people who will travel. One line, and the customer stops expecting a home shower (how big a water tank).

6. Headroom and bed sizes

The finished standing height, not the brochure height. A typical floor and ceiling take 6–7 cm off the raw interior height, so write the finished figure (which vans you can stand up in). For the bed: mattress width and length in centimetres and the clearance to sit up above it. Never write “double”.

7. Price

Parts, labour and total, the markup shown once if you show it, what is excluded (registration, inspection, delivery), how long the quote is valid, and when each payment is due. A price without a validity date is a promise forever.

8. Version number and approval

The sheet is worth nothing if it is not clear which version was agreed. Name the version, date it, and get the customer’s name against it. Every later change is listed against that version, with what it does to weight and price. That page is the change order, and it is the only reliable way to charge for “can we just add a second fridge”.

How this maps to VanPlot

I did not design VanPlot’s Build Pack as a spec sheet, but for a workshop project it covers the list:

  • Plan sheets at 1:20, top view and side elevation, with each unit numbered and located; cabinet sheets with overall sizes and distances from the rear wall, the left wall and the floor.
  • Weight report: build weight, packed gear, rated payload, what is left, and how the added load splits front/rear. The editor’s payload calculator shows the EN 1646-2 reserve for the berths and seats in the layout.
  • Power and water: the System sizer reads the Wh/day of placed appliances and gives battery, solar, charger and days without sun; the water calculator gives days for the number of people. Wiring and water schematics print in the pack.
  • Quote page: your labour rate, markup, validity, deposit split (default 50 / 25 / 25: on approval, at build start, at handover) and your terms.
  • Approve button: the customer presses Approve in their planner or on the share link. The layout is frozen as a version named “Approved by” the customer, with the date; the project status moves to Approved. Edits after that are compared against it and print as a change order with Δ weight and Δ cost per line.
  • Your logo: on a workshop project the Build Pack cover carries your logo, name and tagline, with vanplot.com as a credit line.

What it does not have is a wet-ink signature box on the quote. If your process needs ink, print the quote page with the approved version’s name on it and sign that. The compliance page has a signature line for the technician, and it says what it is: a list of what the layout contains, with the inspection body deciding.

The workshop features come with the Workshop licence: €299 / $329 one-time for the first 10 workshops, then €499 / $549, 3 seats (you plus two colleagues), checked November 2026. The €36 / $39 lifetime licence is for your own van; client work needs the Workshop licence. Everything on the Workshops page, or pricing.

Send it before the deposit, not with it

The order matters. Send the spec sheet, let the customer read it at home, answer the questions, and take the deposit on the approved version. Customers who approve a sheet with 380 kg of payload left do not argue about the bikes later. They chose them with the number in front of them.

FAQ

What should a van conversion spec sheet include?

Eight things: dimensioned plan and side views, an item list with the weight of every item, payload remaining and the front/rear axle split, a power budget (Wh per day, battery, solar), water capacity (fresh and grey, in litres), standing headroom and bed sizes, the price with what it includes, and a version number with the customer's dated approval.

How much payload should a conversion leave free?

EN 1646-2, the European standard for motorhomes, sets a minimum free payload of 10 kg per metre of vehicle length, plus 10 kg per berth, plus 75 kg per travel seat. A 6 m van with 4 berths and 3 travel seats must leave 325 kg free. Put that reserve on the spec sheet next to the payload remaining, so the customer sees both numbers.

Is the spec sheet the contract?

It is the technical attachment the contract points to: what will be built, at what weight, for what price, in which version. Payment terms, warranty and liability belong in your own terms, which depend on the country you trade in. VanPlot prints your terms on the quote page but does not write them.

What happens when the customer changes something after approving?

The approved version stays frozen. You compare the current layout against it and print a change order: every item added, removed, moved or resized, with the weight and cost difference. The customer approves that page the same way they approved the first one.

Can the spec sheet carry my workshop's logo?

With the VanPlot Workshop licence the Build Pack cover carries your logo, name and tagline, the quote page carries your rates, and VanPlot appears only as a credit line. The licence is €299 / $329 one-time for the first 10 workshops, then €499 / $549, with 3 seats: you plus two colleagues.

Your van is waiting. Measure it, then plan it.

In sixty seconds you'll be dragging a bed into a Ducato. Free, in your browser.

Vladimir Šterjoski

Who makes this

I'm Vladimir. I'm planning my own conversion, and none of the tools I tried could tell me whether a layout would fit or what it would do to the rear axle, so I made this one. I work on it alone. If something's wrong or missing, write to me — the address goes to my inbox.

Vladimir Šterjoski

vladimir@vanplot.comWhy I made it